MIL-V-62008B(AT)
Table VI. Maximum acceptable noise levels for Army Materiel
Command equipment (continuous noise)
Octave band Center frequency (Hz) |
Maximum acceptable noise level (db ref. 0.0002 microbrar) |
63 125 250 500 1000 2000 4000 8000 |
121 111 103 102 100 100 100 100 |
3.12 Workmanship. Workmanship shall be of a quality to assure that vehicle and components are free from defects resulting from improper manufacturing or assembly practices and shall conform to requirements herein specified.
3.13 Recycled, virgin and reclaimed materials. The use of recycled materials which meet the requirements of the applicable item or part without jeopardizing its intended use shall be encouraged.
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.1.1 Contractor's quality control system. Unless otherwise specified by the acquisition activity, the contractor shall provide and maintain an effective Inspection and quality Control System acceptable to the Government covering the supplies under the contract. A current written description of the system shall be submitted by the contracting officer prior to initiation of production. The contractor will not be restricted to the inspection station or to the method of inspection listed
provided that an equivalent control is included in the approved quality control procedure. The contractor shall notify the Government of and obtain approval for any change to the written procedure that might affect the degree of control required by this specification or other applicable documents referenced herein.
4.1.2 Government verification. All quality assurance operations performed by the contractor shall be subject to Government verification at unscheduled intervals. Verification shall consist of
(a) surveillance of the operations to determine that practices, methods, and procedures of the written
22
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business