4.4.3.2 Completed production sample contractor inspection. The production sample vehicle shall be road tested and inspected by the contractor as specified in 4.5.3.1, to determine conformance to contract and specifications. After inspection, the contractor shall submit the vehicle (and all inspection records and certifications) to the responsible Government representative at contractor plant for preliminary examination.
4.4.3.3 Preliminary examination. The responsible Government representative shall conduct a preliminary examination as specified in 4.5.2, of the production sample vehicle.
4.4.3.4 Provisional inspection. Provisional inspection of the production sample vehicle shall be conducted jointly by representatives of TACOM product assurance directorate and the responsible Government representative. The contractor shall provide any required assistance. Testing will be as specified in 4.5.3.1. Contractor shall make available his inspection plan, records, and certifications pertinent to the vehicle and components.
4.4.3.5 Repair of defects. Defects found as a result of the foregoing inspections shall be corrected by the contractor. Failure of the contractor to correct defects promptly shall be cause for suspension of acceptance of vehicles until corrective action has been approved by the Government.
4.4.3.6 Vehicle disposition. On completion of the sample production vehicle inspection, the vehicle shall remain at the manufacturing facility as a production sample and shall be released at the discretion of the Government. The contractor shall service and maintain the vehicle during this period.
4.4.3.7 Final approval and acceptance. Final approval and acceptance of the initial production vehicle(s) shall be withheld until production sample vehicle is accepted (see 4.3).
4.4.4 First article inspection failure. Test item deficiencies during, or as a result of, the first article test, shall be cause for rejection of the items until evidence has been provided by the contractor that corrective action has been taken to eliminate the deficiency. Any deficiency found during, or as a result of the first article test, shall be prime facie evidence that all items already produced prior to completion of the first article test are similarly deficient unless evidence satisfactory to the contracting officer is furnished by the contractor that they are not similarly deficient. Such deficiencies on all items shall be corrected by the contractor at no cost to the Government. The Government shall not final accept products until first article testing is completed to the satisfaction of the Government.
4.5 Quality conformance inspection.
4.5.1 Sampling.
4.5.1.1 Lot formation. An inspection lot shall consist of all vehicles from an identifiable production period submitted at one time by the contractor to determine conformance with acceptability criteria.