MIL-PRF-62195D(AT)
3. REQUIREMENTS
3.1 First article. When specified (see 6.2), a sample shall be subjected to first article
inspection in accordance with 4.3.1.
3.2 Design, materials, and manufacturing processes. Unless otherwise specified (see 6.2)
the design, materials, and manufacturing process selection is the prerogative of the contractor as
long as all articles submitted to the government fully meet the operating, interface, ownership and
support, and operating environment requirements specified.
3.2.1 Recycled, recovered, or environmentally preferable materials. Recycled, recovered,
or environmentally preferable materials shall be used to the maximum extent possible provided
that the material meets or exceeds the operational and maintenance requirements, and promotes
economically advantageous life cycle costs.
3.3 Operating requirements. Each vehicle shall provide the following functional,
operational, and performance capabilities.
3.3.1 Sealing.
3.3.1.1 Seals. Except as noted herein, seals shall restrict the entrance of water and
foreign matter and shall restrict the leaking of lubricants from the bearings.
3.3.1.2 Door, hatch and vision device seals. Seals shall prevent the entrance of water into
the crew compartment.
3.3.1.3 Air cleaner outlet hose system. The air cleaner outlet hose system shall be air
tight. Vacuum loss shall be not greater than 5 inches (in,) of water during a 3 minute (min)
period.
3.3.2 Special kits. When specified (see 6.2), special kits shall be furnished as follows.
3.3.2.1 Winterization kit. The winterization kit shall assure satisfactory engine starting
and vehicle operation in ambient temperatures of -25 to -65 degrees Fahrenheit (°F).
3.3.2.2 Fording kit (deep water). The deep water fording kit shall assure vehicle
performance as specified in 3.6.2.2.
3.3.2.3 Chemical, bacteriological, radiological kit (CBR). The CBR kit shall function as a
gas particulate filter system. The kit shall allow an air flow of 3.5 to 4.5 cubic feet per minute
(ft3/min) for each crew position outlet when the other crew position bases are connected to their
stowage orifice.
3
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business