MIL-DTL-62270B(AT)
TABLE IV. Classification of inspection and tests - Continued.
1st article
Acceptance
Title
Requirement
Verification
test 1/
test 2/
Generator blower motor
3.4.1.14.1
4.7.1.13
X
X
Air cleaner blower motor
3.4.1.15
4.7.1.14
X
Lights
3.4.1.16
4.7.1.15
X
X
Driver night viewer
3.4.1.17
4.7.1.15
X
power circuit
Hull drain valves
3.4.1.18.1
4.7.1.16
X
Escape hatch release
3.4.1.18.2
4.7.1.17
X
X
Operator and assistant
3.4.1.18.3
4.7.1.18
X
X
operator seat
Fuel shutoff valve
3.4.1.18.4
4.7.1.19
X
Fire extinguisher
3.4.1.19
4.7.1.20
X
X
Personnel heater
3.4.1.20
4.7.1.21
X
X
Engine smoke generator
3.4.1.21.1
4.7.1.22
X
Arming test
3.4.1.21.2.1
4.7.1.22.1.1
X
X
Circuit test
3.4.1.21.2.2
4.7.1.22.1.2
X
X
In-tank fuel pumps
3.4.1.22
4.7.1.23
X
Fuel return
3.4.1.23
4.7.1.24
X
Air cleaner
3.4.1.24
4.7.1.25
X
X
Break-in
3.4.1.25
4.7.1.26
X
X
Sealing
3.4.1.26
4.7.1.27
X
Escape hatch seal
3.4.1.27
4.7.1.28
X
X
Support and ownership
requirements
Painting
3.5.1.1
4.8.1
X
X
Marking
3.5.1.2
4.8.1
X
X
Plates
3.5.1.3
4.8.1
X
X
Operating environmental
requirements
Environments
3.6.1
4.9.1
X
Equipment operation
3.6.2.1
4.9.2
X
Operator protection
3.6.2.2
4.9.2
X
X
1/ = Chassis shall be tested at Government proving ground.
2/ = Chassis shall be tested on Contractor's premises.
4.2.2 Initial production inspection. On beginning production, three chassis shall undergo,
and shall pass, initial production inspections. Inspections shall include the examinations of
table III and the tests of table IV.
16